The Hive Construction Updates

The Latest on The Hive

Located just 23 minutes outside of London, this new Luton residence is a hotspot commuter belt investment opportunity. Luxury apartments combine with unbeatable onsite facilities to create new accommodation ideal for young professionals. Check back on this page for all of the latest The Hive construction updates as they happen.  

Current Progress 

  • Ongoing technical meetings
  • Finalisation of internal and external build
  • Mechanical and electrical specifications are nearing completion

2022

2021

This month at The Hive, the onsite surveys have been completed along with finishing touches made to the substation details. 

Another task completed is the finishing touches and monitorisation of all structural drawings. Finalisations are also being made to the pre-construction programme.

Summary of Works Progressed 

  • Ongoing technical meetings
  • Designs of external and internal build are being finalised
  • Completion of onsite surveys
  • Progression of all pre-commencement planning conditions
  • Completion and monitorisation of all structural drawings
  • Mechanical and electrical specifications are nearing completion
  • Finishing touches to the substation details
  • Finalisation of pre-construction programme

Works Anticipated 

  • Existing soakaway to be utilised for surface water and foul water to go to Oxford Rd
  • Fire strategy produced to be reviewed and finalised as required
  • Design team works on site to start in May 2022
  • Brick choice agreed and being submitted to Luton Borough Council for approval
  • Meetings to ensure all technical construction aspects are determined

Pre-construction activities at The Hive have begun.

The commencement of pre-contract appointments with a number of professional teams, including the architect, structural engineers and health and safety has begun. Appointments have also begun with the construction design and management consultants and mechanical and electrical consultants. 

Summary of Works Progressed 

  • The architect has produced the proposed drawings and plans, coordinated with the structural, mechanical and electrical design requirements 
  • Mechanical and electrical teams have also delivered general arrangement drawings for every essential system to be implemented in the site 
  • Appointments are being made to the Professional Team 
  • Ground excavation and clearing of the site is currently taking place, with a low-level substructural dig taking place 
  • Detailed site surveys, trial holes and site investigations have begun 
  • The concrete frame design is being elaborated, with an experienced professional in place to deal with the ground works, foundations and structural frame phases of the buildings 

Works Anticipated 

  • Reinforced site hoarding is to be installed shortly. 

2022

This month at The Hive, the onsite surveys have been completed along with finishing touches made to the substation details. 

Another task completed is the finishing touches and monitorisation of all structural drawings. Finalisations are also being made to the pre-construction programme.

Summary of Works Progressed 

  • Ongoing technical meetings
  • Designs of external and internal build are being finalised
  • Completion of onsite surveys
  • Progression of all pre-commencement planning conditions
  • Completion and monitorisation of all structural drawings
  • Mechanical and electrical specifications are nearing completion
  • Finishing touches to the substation details
  • Finalisation of pre-construction programme

Works Anticipated 

  • Existing soakaway to be utilised for surface water and foul water to go to Oxford Rd
  • Fire strategy produced to be reviewed and finalised as required
  • Design team works on site to start in May 2022
  • Brick choice agreed and being submitted to Luton Borough Council for approval
  • Meetings to ensure all technical construction aspects are determined

2021

Pre-construction activities at The Hive have begun.

The commencement of pre-contract appointments with a number of professional teams, including the architect, structural engineers and health and safety has begun. Appointments have also begun with the construction design and management consultants and mechanical and electrical consultants. 

Summary of Works Progressed 

  • The architect has produced the proposed drawings and plans, coordinated with the structural, mechanical and electrical design requirements 
  • Mechanical and electrical teams have also delivered general arrangement drawings for every essential system to be implemented in the site 
  • Appointments are being made to the Professional Team 
  • Ground excavation and clearing of the site is currently taking place, with a low-level substructural dig taking place 
  • Detailed site surveys, trial holes and site investigations have begun 
  • The concrete frame design is being elaborated, with an experienced professional in place to deal with the ground works, foundations and structural frame phases of the buildings 

Works Anticipated 

  • Reinforced site hoarding is to be installed shortly. 

Future Completed Project Visualizations

Invest in The Hive

View Property Details

Refer a Friend to RWinvest

Have you heard about our referral scheme? With our referral scheme, you can be rewarded by simply recommending a fellow investor to RWinvest.

Each time you refer someone to our properties, and they go on to make a sale, you’ll earn £500. It’s one of the easiest ways to generate a quick cash boost on top of your lucrative investment earnings!

If you have a friend or family member who’s thinking of buying an investment property, and you’re happy with the service you experienced with us, get in touch with us today to find out how to get involved with our referral scheme.

Invest From £50,000

The Hive

Creating a Buzz in the Luton Market

Luton Prices from £194,950

5% Rental Returns 

75% Sold Out - Units Selling Fast

CALL US
WHATSAPP
LIVE CHAT