Grand Union Construction Updates
Located on Cook Street in the heart of Liverpool, the development boasts fantastic access to the wider city and beyond. Its central position makes exploring everything from the historic waterfront to the vibrant Baltic Triangle effortless, ensuring residents and visitors can experience the very best of Liverpool right on their doorstep. Stay up to date with the latest construction updates for this development.
Q1 2026 Update
Grand Union, Construction Update – Q1 2026
Grand Union – Construction Update Q1 2026
Latest Progress Report
- Windows ordered and moving into manufacture
All new windows for the refurbished elevations have now been ordered, with manufacturing underway to support the next phase of the external upgrade. These units will significantly improve both the performance and appearance of the building as it transitions from office use into luxury residential accommodation. - Apartment walls ongoing on all levels
Internal wall construction is progressing well across every floor, helping to define the layout of individual apartments throughout the scheme. This is a key milestone in the conversion programme, as the former open-plan office areas evolve into clearly configured residential spaces. - Plumbers on site installing SVPs to all levels
Plumbing teams are actively installing soil vent pipes on all floors, advancing the main vertical drainage routes required for the new apartments. These essential services are being coordinated closely with other trades to keep the wider mechanical programme on track. - Electricians first fixing on levels 2 and 3
Electrical first fix works are underway on levels 2 and 3, establishing the wiring, containment, and service routes ahead of future finishes. This stage lays the groundwork for modern power, lighting, and technology provision within the refurbished apartments. - Ductwork installation on levels 1 and 2
Ducting contractors are on site installing ventilation ductwork across levels 1 and 2, integrating new systems within the existing structure. These installations will support high-quality internal environments in line with the building’s upgraded residential specification. - Lift ordered, with installation being brought forward
The new lift system has now been ordered as part of the ongoing modernisation of the former office building. The project team is working to bring installation forward where possible, helping to support future fit-out phases and improve access as works progress.
Q4 2025 Update
Grand Union, Construction Update – Q4 2025
Grand Union – Construction Update Q4 2025
Site Setup & Infrastructure Progress
- Materials are arriving on site
Key materials for the upcoming construction phases have now arrived on site, positioning the team well to maintain strong momentum over the coming weeks. - Hoist and scaffolding is being installed
The hoist is being erected and scaffolding installation is well underway, improving site access and enabling external works to progress swiftly. - Lift replacement works are underway
The original lift systems have been fully removed. Preparations are now in place for the installation of brand-new, modern lift units that will significantly enhance the overall building experience. - Service containers are being prepared
Specialised containers that will house the electrical and water infrastructure are currently being prepared for installation. This marks an important step toward fully modernising the building’s core services.
Internal Works & Refurbishment Progress
- Mechanical and electrical work is advancing
Mechanical and electrical work continues to progress positively, with engineers coordinating installations to ensure a seamless transition into the main construction phases. - The soft strip is complete
The full soft strip has now been completed, clearing internal spaces and enabling the refurbishment team to move confidently into the next programme milestones. - Defect repairs are underway
Site defects identified during early inspections are now being actively repaired. The team is progressing efficiently, ensuring a strong foundation for the next stages of refurbishment.
Why Choose RWinvest?
Here is why you should choose RWinvest as your UK property investment company:
Contact Us
Want to Get in Touch?
Fill in the form to contact us today and a member of our award-winning property team will be in touch to help.